The drywall dust has finally cleared it’s time to stir it up again. This time it will be with sawdust though. Since the linoleum stripped did such a good job removing the floor finish I thought I could save time and do a better finish by stripping the rest of the floors. In my mind I figured I just sand lightly with a pad sander and not risk the gouges I’ve experienced with the drum sander. After spending another 2 evenings stripping the floors, I was ready to sand. I rented a vibrating pad sander from Home depot and began to sand. In short it did not work; AT ALL! It simply was not aggressive enough sand even the bare wood floors. I quickly loaded everything back up in the truck and exchanged it for a drum sander. I made the first pass getting as close as possible to wall then Carri took over with the drum sander and continued with the edging sander.davesandcarrisand Before Carri made the final pass with 250 grit I took some of the sawdust, mixed with untinted wood filler and filled all of the crack in the floor. Fortunately, there weren’t to may sport that required filler. Even with the wasted time I spent with the pad sander I still was able to get the sander back to Home Depot within the 24 hours, but just barely. We decide to wait a couple days before we spread the polyurethane.  That would give time for the dust to settle again and we could rest up for a couple of days.

I started about 5:00 AM on Sunday morning while Cari was still sleeping. Worst case she may have been stuck in the back for 2 hours since waterbourne poly dries within that time. We had vacuumed and swept the night before so just ran over the floor with tack cloth and put on the first coat.  By 5:00 PM Sunday evening the floor was done. I considered scuffing the floor one last time and putting a fourth coat but Carri was happy with the way it looked and we called it done.

floordoneAll of the baseboards had been stripped of the paint and varnish and sanded. While waiting for the floor to cure completely we finished trim with 3 coats of poly. I used one of the door jambs to make rails and stile for the hall cabinet doors and re-purposed the wainscot for the panels. The door have a few defects but they look great.
cabs trim

Painting and replacing the trim, and moving the furniture back quickly brought everything together. We started in mid January and had everything moved back in by mid March. Three months and 3 thousand dollars in materials and it is time to close the wallet until the next project. Unfortunately the next project will be putting another rental back together often the tenant moves out next week. diningview2

diningden

dendone2

No Comments